Show on map
Fair Wind — Power plant · Wind · Fair Wind Power Partners, LLC4786B George Washington, LLC — Solar · MD · 2 MW · 13.3 km away4786A George Washington, LLC — Solar · MD · 2 MW · 15.7 km awayPea Patch Wind Farm — Wind · MD · 50 MW · 22.8 km away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Wind

Key facts

Power plant · Windran 33% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2025
85,805 MWh
Grid
138 kV to The Potomac Edison Company (PJM)
Location
Garrett County, Maryland
Operated by
Fair Wind Power Partners, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2015 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
11 years since 2015
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000908840
Location id
L100000906549
Eia plant ids
59147
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
138
Transmission owner
The Potomac Edison Company
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 2025292,766
Capacity factor, 20250.327
Net generation (MWh), 202585,805
Balancing authority codePJM

Wind turbines

Turbines
12
Turbine capacity (MW)
30
Turbine models
12 Nordex N100
Hub height (m)
100
Rotor diameter (m)
100
Year online
2015

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
4786B George Washington, LLC Under construction Solar 13.3 km 2
4786A George Washington, LLC Under construction Solar 15.7 km 2
Pea Patch Wind Farm Postponed Wind 22.8 km 50

Sources EIA-860M

Sources

Attribution