Show on map
Fentress - Sligo 230 kV — Transmission lineEDGE CONNEX DATA CENTER — Filed · Large load · VA · 12.0 mi awaySENTARA HEALTHCARE — Built · Large load · VA · 12.6 mi away
  • Loads
  • In development
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Fentress - Sligo 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC, US-VA
Owner (as stated)
Virginia Electric Power

Details

Who’s behind it

Owner
Virginia Electric Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
22
Substations at the ends (as the source names them)
Fentress to Sligo
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itvirginia electric power
HIFLD line ID104407
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
EDGE CONNEX DATA CENTER Filed Large load 12.0 mi
SENTARA HEALTHCARE Built Large load 12.6 mi

Sources EPA ICIS-Air · Virginia DEQ

Sources

  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026
  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality

Attribution