Fighting Creek LFGTE Plant — Power plant · Biomass · Kootenai Renewable Energy LLC
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Fighting Creek LFGTE Plant

Power plant · Biomass

Key facts

Power plant · Biomassran 78% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2025
21,845 MWh
Grid
25 kV to Kootenai Electric Cooperative (AVA)
Location
Kootenai County, Idaho
Operated by
Kootenai Renewable Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
21,845MWh
Fuel burned, 2025
262,422MMBtu
Capacity factor, 2025
77.9%
Heat rate, 2025
12,013Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
202521,845262,42277.9%12,013
202419,896209,50470.8%10,530
202317,013197,49260.7%11,608
202213,970187,87249.8%13,448
202113,736179,16549.0%13,044
202017,845189,61863.5%10,626
201915,424166,08155.0%10,768
201814,854163,37653.0%10,999
201712,195126,73443.5%10,392
201611,453122,73840.8%10,717
201512,485139,54244.5%11,177
20148,639100,74230.8%11,661
201311,019117,22439.3%10,638
2012 (10 of 12 months)9,776106,588—10,903
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)