FirstEnergy Springdale Power Station: location and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
FirstEnergy Springdale Power Station
Power plant · Oil
Key facts
Power plant · Oil Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1945
- Location
- Allegheny County, Pennsylvania
- Operated by
- Allegheny Energy Supply Co LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 81 years since 1945
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- May 2005
- Capacity retired
- 215.3 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 7 | Petroleum Liquids | 74.7 MW | Retired | May 2005 |
| 8 | Petroleum Liquids | 140.6 MW | Retired | May 2005 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- PJM
Transmission lines within 15 mi (10)
- Firstenergy Springdale Power Station - Allegheny Energy Units 138 kV
- Firstenergy Springdale Power Station - Harwick 138 kV
- Firstenergy Springdale Power Station - Cheswick 138 kV
- Cheswick Power Plant - Cheswick 138 kV
- Cheswick Power Plant - Pine Creek 138 kV
- Cheswick Power Plant - Pine Creek 138 kV
- Cheswick Power Plant - Cheswick 138 kV
- Cheswick - North 138 kV
- Cheswick - Pine Creek 138 kV
- Cheswick - Plum 138 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 7, 8 scheduled to retire, 215.3 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · LBNL · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| CW Bill Young Hydropower Project Filed | Hydro | 2.6 mi | 8.4 |
| Allegheny Lock and Dam 4 Filed | Hydro | 5.4 mi | 6.4 |
| Braddock Lock and Dam Filed | Hydro | 11.8 mi | 5.3 |
| PNC PITTSBURGH DATA CENTER Built | Large load | 14.2 mi |
Sources EIA-860M · EPA ICIS-Air