FirstEnergy Springdale Power Station — Power plant · Oil · Allegheny Energy Supply Co LLCCW Bill Young Hydropower Project — Filed · Hydro · PA · 8.4 MW · 2.6 mi awayAllegheny Lock and Dam 4 — Filed · Hydro · PA · 6.4 MW · 5.4 mi awayBraddock Lock and Dam — Filed · Hydro · PA · 5.3 MW · 11.8 mi awayPNC PITTSBURGH DATA CENTER — Built · Large load · PA · 14.2 mi away
  • Combustion
  • Clean firm
  • Loads
  • In development
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

FirstEnergy Springdale Power Station

Power plant · Oil

Key facts

Power plant · Oil Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1945
Location
Allegheny County, Pennsylvania
Operated by
Allegheny Energy Supply Co LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
81 years since 1945
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
May 2005
Capacity retired
215.3 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
7Petroleum Liquids74.7 MWRetiredMay 2005
8Petroleum Liquids140.6 MWRetiredMay 2005

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
PJM
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 7, 8 scheduled to retire, 215.3 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · LBNL · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CW Bill Young Hydropower Project Filed Hydro 2.6 mi 8.4
Allegheny Lock and Dam 4 Filed Hydro 5.4 mi 6.4
Braddock Lock and Dam Filed Hydro 11.8 mi 5.3
PNC PITTSBURGH DATA CENTER Built Large load 14.2 mi

Sources EIA-860M · EPA ICIS-Air