Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1952
Location
Floyd County, Texas
Operated by
City of Floydada - (TX)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
74 years since 1952

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
July 2002
Capacity retired
6.8 MW
Generators retired
5
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
2Natural Gas Internal Combustion Engine1.2 MWRetiredJuly 2002
3Natural Gas Internal Combustion Engine1.2 MWRetiredJuly 2002
4Natural Gas Internal Combustion Engine1.2 MWRetiredJuly 2002
5Natural Gas Internal Combustion Engine1.2 MWRetiredJuly 2002
6Natural Gas Internal Combustion Engine2 MWRetiredJuly 2002

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 2, 3, 4, 5, 6 scheduled to retire, 6.8 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · OpenStreetMap · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Cone Renewable Energy Project, LLC Filed Wind 19.4 km 150

Sources EIA-860M

Sources

Attribution