Key facts
Power plant · Gas, reciprocating engine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1952
- Location
- Floyd County, Texas
- Operated by
- City of Floydada - (TX)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 74 years since 1952
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- July 2002
- Capacity retired
- 6.8 MW
- Generators retired
- 5
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 2 | Natural Gas Internal Combustion Engine | 1.2 MW | Retired | July 2002 |
| 3 | Natural Gas Internal Combustion Engine | 1.2 MW | Retired | July 2002 |
| 4 | Natural Gas Internal Combustion Engine | 1.2 MW | Retired | July 2002 |
| 5 | Natural Gas Internal Combustion Engine | 1.2 MW | Retired | July 2002 |
| 6 | Natural Gas Internal Combustion Engine | 2 MW | Retired | July 2002 |
Grid
Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.Transmission lines within 25 km (10)
- Power line, voltage not stated (OSM way 20856788)
- Xcel Energy 345 kV line (OSM way 168061104)
- Xcel Energy 345 kV line (OSM way 464728690)
- Sharyland Utilities 345 kV line (OSM way 490163672)
- 345 kV line (OSM way 490163651)
- 345 kV line (OSM way 490163649)
- 345 kV line (OSM way 490163648)
- 115 kV line (OSM way 1556850478)
- 345 kV line (OSM way 505843811)
- 115 kV line (OSM way 1556850479)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 2, 3, 4, 5, 6 scheduled to retire, 6.8 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · OpenStreetMap · EIA-860M Preliminary Monthly Electric Generator Inventory
© OpenStreetMap contributors
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Cone Renewable Energy Project, LLC Filed | Wind | 19.4 km | 150 |