Show on map
- Combustion
- Storage
- Loads
- In development
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Storage
- Loads
- In development
- Operating
- Size not stated
Fort Carson Battery Energy Storage Syste: location and 7 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Fort Carson Battery Energy Storage Syste
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2018
- Net generation, 2025
- -3,480 MWh
- Grid
- 12 kV to City of Colorado Springs - (CO) (WACM)
- Location
- El Paso County, Colorado
- Operated by
- Department of the Army, Fort CarsonSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 8 years since 2018
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -3,480 |
| Balancing authority code | WACM |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -3480.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| VINEYARD DATA CENTER Built | Large load | 2.8 mi | |
| COS01 DATA CENTER Built | Large load | 3.7 mi | |
| Drennan Energy Storage Filed | Storage | 6.3 mi | 100 |
| Horizon Announced | Gas, combustion turbine | 6.3 mi | 480 |
| VERIZON WIRELESS - DATA CENTER Built | Large load | 11.4 mi | |
| QTS COLORADO SPRINGS I - DATA CENTER Built | Large load | 12.1 mi | |
| Pike Solar Hybrid Postponed | Storage | 13.6 mi | 25 |
Sources EPA ICIS-NPDES · EIA-860M · EPA ICIS-Air