Fort Davis
Power plant · Wind
Key facts
Power plant · Windran 2% of 2003 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1993
- Net generation, 2003
- 1,299 MWh
- Location
- Jeff Davis County, Texas
- Operated by
- AEP Texas North CompanySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 33 years since 1993
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2003
- Capacity retired
- 6.6 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 6.6 MW | Retired | December 2003 |
Grid
Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.Transmission lines within 15 mi (10)
- American Electric Power 69 kV line (OSM way 503390921)
- 69 kV line (OSM way 503390920)
- American Electric Power 69 kV line (OSM way 503390922)
- American Electric Power 69 kV line (OSM way 503390924)
- 69 kV line (OSM way 503390917)
- American Electric Power 69 kV line (OSM way 503390925)
- 69 kV line (OSM way 503390916)
- American Electric Power 69 kV line (OSM way 503390927)
- 138 kV line (OSM way 500535884)
- 69 kV line (OSM way 503390915)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 1 scheduled to retire, 6.6 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
© OpenStreetMap contributors
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- OpenStreetMap© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory