Show on map
Fort Phantom — Power plant · Gas, steam turbine · AEP Texas North CompanyLONGHORN DATA CENTER — Large load · TX · 11.9 km away1300 luffer crane (Abilene data centre) — Large load · TX · 11.9 km awaySummerhill BESS — Storage · TX · 143 MW · 13.1 km awayABILENE DATA CENTER PH3 BLDGS 9-10 — Large load · TX · 14.0 km awayFunston Solar — Solar · TX · 351.1 MW · 22.6 km away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Fort Phantom

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1974
Net generation, 2005
0 MWh
Location
Jones County, Texas
Operated by
AEP Texas North CompanySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2005
Fuel burned MMBtu by year, 2001 to 2005
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
52 years since 1974

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2005
Capacity retired
363 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Steam Turbine156 MWRetiredJanuary 2005
2Natural Gas Steam Turbine207 MWRetiredJanuary 2005

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 25 km (10)
Connection points within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2 scheduled to retire, 363 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · OpenStreetMap · ERCOT · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
LONGHORN DATA CENTER Built Large load 11.9 km
1300 luffer crane (Abilene data centre) Filed Large load 11.9 km
Summerhill BESS Announced Storage 13.1 km 143
ABILENE DATA CENTER PH3 BLDGS 9-10 Under construction Large load 14.0 km
Funston Solar Under construction Solar 22.6 km 351.1