Show on map
Fort Rucker Solar Array — Power plant · Solar · Alabama Power CoPinckard Solar — Postponed · Solar · AL · 85.1 MW · 11.7 mi away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Fort Rucker Solar Array

Power plant · Solar

Key facts

Power plant · Solarran 14% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
12,548 MWh
Grid
12 kV to Alabama Power Co (SOCO)
Location
Dale County, Alabama
Operated by
Alabama Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
9 years since 2017
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815724
Location id
L100000813048
Eia plant ids
60679
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Alabama Power Co
Balancing authority code
SOCO
Balancing authority name
Southern Company Services, Inc. - Trans
Fuel burned (MMBtu), 202542,815
Capacity factor, 20250.135
Net generation (MWh), 202512,548
Balancing authority codeSOCO

Solar arrays

Array area (acres)
46.4
AC capacity (MW)
10.6
DC capacity (MW)
12.7
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2017

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Pinckard Solar Postponed Solar 11.7 mi 85.1

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution