Show on map
Fortson 230 kV line — Transmission lineADDITIONS AND MODIFICATIONS TO SYNOVUS DATA CENTER — Large load · GA · 3.5 mi awayTalbot County Energy — Announced · Gas, combustion turbine · GA · 262 MW · 8.3 mi awayH Allen Franklin Combined Cycle — Postponed · Gas, combined cycle · AL · 688.1 MW · 10.7 mi away
  • Combustion
  • Loads
  • In development
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Fortson 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-GA
Owner (as stated)
Georgia Power

Details

Who’s behind it

Owner
Georgia Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
5
Substations at the ends (as the source names them)
Fortson
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itgeorgia power
HIFLD line ID142763
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
ADDITIONS AND MODIFICATIONS TO SYNOVUS DATA CENTER Unknown Large load 3.5 mi
Talbot County Energy Announced Gas, combustion turbine 8.3 mi 262
H Allen Franklin Combined Cycle Postponed Gas, combined cycle 10.7 mi 688.1

Sources EPA ICIS-NPDES · EIA-860M

Sources

Attribution