Show on map
- Wind & solar
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
Foundation RRM: location and 4 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Foundation RRM
Power plant · Wind
Key facts
Power plant · Windran 55% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2012
- Net generation, 2025
- 9,676 MWh
- Grid
- 0.5 kV to Southern California Edison Co (CISO)
- Location
- Riverside County, California
- Operated by
- Foundation CA Fund V Manager, LLC
Output
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 14 years since 2012
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 33,014 |
| Capacity factor, 2025 | 0.552 |
| Net generation (MWh), 2025 | 9,676 |
| Balancing authority code | CISO |
Wind turbines
- Turbines
- 2
- Turbine capacity (MW)
- 3.2
- Turbine models
- 2 GE Wind GE1.6-82.5
- Hub height (m)
- 80
- Rotor diameter (m)
- 82.5
- Year online
- 2012
Source U.S. Wind Turbine Database
Source
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Foundation CA Fund V Manager, LLC | Operator | EIA-860M | ||
| Foundation CA Fund V Owner, LLC | Owner | 100.0% | 31 Dec 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- U.S. Wind Turbine Database (USWTDB) — USGS, American Clean Power Association and LBNL; one row per turbineMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Alta Mesa Project Phase IV Postponed | Wind | 14.4 km | 40 |
| Painted Hills IV Wind Withdrawn | Wind | 18.3 km | 19.5 |
| Painted Hills Postponed | Wind | 18.5 km | 17.5 |
| Solar Photovoltaic Project #45 Postponed | Solar | 24.4 km | 6 |
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- CAISO Public Queue ReportSource: California ISO