Show on map
Fox Lake — Power plant · Gas, steam turbine · Interstate Power and Light Co
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 1% of 2016 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1950
Net generation, 2016
13,680 MWh
Grid
161 kV, 69 kV to ITC Midwest LLC (MISO)
Location
Martin County, Minnesota

Output

Net generation MWh by year, 2001 to 2017
Fuel burned MMBtu by year, 2001 to 2017
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
76 years since 1950
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000427048
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000685
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
November 2017
First unit retired
November 2010
Capacity retired
133.4 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
2Natural Gas Steam Turbine11.5 MWRetiredNovember 2010
4Petroleum Liquids28.8 MWRetiredNovember 2010
1Natural Gas Steam Turbine11.5 MWRetiredNovember 2017
3Natural Gas Steam Turbine81.6 MWRetiredNovember 2017
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine104.6 MW
Petroleum Liquids28.8 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
161 kV, 69 kV
Transmission or distribution system owner
ITC Midwest LLC
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Transmission lines within 15 mi (6)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Interstate Power and Light Co Operator EIA-860M
ALLIANT ENERGY CORP Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units 1, 3 scheduled to retire, 93.1 MW · EIA-860M
  • Stated Units 2, 4 scheduled to retire, 40.3 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source