Fox Metro Water Reclamation District — Power plant · Gas, reciprocating engine · Fox Metro Water Reclamation6097.00-IL CyrusOne - CHI 11A - Yorkville — Filed · Large load · IL · 7.3 mi awayAurora 7-SLCHI307 — Under construction · Solar · IL · 1.9 MW · 7.3 mi awayCYRUSONE LLC — Large load · IL · 7.9 mi awayMERIDIAN PARKWAY DATA CENTER OWNER LLC — Built · Large load · IL · 8.1 mi awayCYRUSONE LLC — Large load · IL · 8.3 mi awayEDGED CHICAGO LLC — Built · Large load · IL · 8.7 mi awayKN216 — Under construction · Solar · IL · 4.9 MW · 10.7 mi away1454.07-IL 7 (Gevena data centre) — Filed · Large load · IL · 12.1 mi awayCOLOVORE LLC — Built · Large load · IL · 13.2 mi awayORD-02 (West Chicago data centre) — Filed · Large load · IL · 13.2 mi awayRomeoville 34 - SLCHI234 - BSCHI234 — Under construction · Storage · IL · 0.5 MW · 14.8 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Fox Metro Water Reclamation District

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1988
Net generation, 2019
0 MWh
Location
Kendall County, Illinois
Operated by
Fox Metro Water ReclamationSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2019
Fuel burned MMBtu by year, 2001 to 2019
  • Gas
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
38 years since 1988
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2018
Capacity retired
2.2 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
RU3Natural Gas Internal Combustion Engine1.1 MWRetiredOctober 2018
RU4Natural Gas Internal Combustion Engine1.1 MWRetiredOctober 2018

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
PJM
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units RU3, RU4 scheduled to retire, 2.2 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
6097.00-IL CyrusOne - CHI 11A - Yorkville Filed Large load 7.3 mi
Aurora 7-SLCHI307 Under construction Solar 7.3 mi 1.9
CYRUSONE LLC × 2 units Unknown Large load 7.9 mi
MERIDIAN PARKWAY DATA CENTER OWNER LLC Built Large load 8.1 mi
EDGED CHICAGO LLC Built Large load 8.7 mi
KN216 Under construction Solar 10.7 mi 4.9
1454.07-IL 7 (Gevena data centre) Filed Large load 12.1 mi
COLOVORE LLC Built Large load 13.2 mi
ORD-02 (West Chicago data centre) Filed Large load 13.2 mi
Romeoville 34 - SLCHI234 - BSCHI234 Under construction Storage 14.8 mi 0.5

Sources FAA OE/AAA · EIA-860M · EPA ICIS-Air