Fox Metro Water Reclamation District: location and 11 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Fox Metro Water Reclamation District
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1988
- Net generation, 2019
- 0 MWh
- Location
- Kendall County, Illinois
- Operated by
- Fox Metro Water ReclamationSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 38 years since 1988
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- October 2018
- Capacity retired
- 2.2 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| RU3 | Natural Gas Internal Combustion Engine | 1.1 MW | Retired | October 2018 |
| RU4 | Natural Gas Internal Combustion Engine | 1.1 MW | Retired | October 2018 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- PJM
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units RU3, RU4 scheduled to retire, 2.2 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| 6097.00-IL CyrusOne - CHI 11A - Yorkville Filed | Large load | 7.3 mi | |
| Aurora 7-SLCHI307 Under construction | Solar | 7.3 mi | 1.9 |
| CYRUSONE LLC × 2 units Unknown | Large load | 7.9 mi | |
| MERIDIAN PARKWAY DATA CENTER OWNER LLC Built | Large load | 8.1 mi | |
| EDGED CHICAGO LLC Built | Large load | 8.7 mi | |
| KN216 Under construction | Solar | 10.7 mi | 4.9 |
| 1454.07-IL 7 (Gevena data centre) Filed | Large load | 12.1 mi | |
| COLOVORE LLC Built | Large load | 13.2 mi | |
| ORD-02 (West Chicago data centre) Filed | Large load | 13.2 mi | |
| Romeoville 34 - SLCHI234 - BSCHI234 Under construction | Storage | 14.8 mi | 0.5 |
Sources FAA OE/AAA · EIA-860M · EPA ICIS-Air