Show on map
FPL Energy Illinois Wind LLC Hybrid — Power plant · Wind · FPL Energy Illinois Wind LLCSteward Creek Solar Phase 1 — Announced · Solar · IL · 1,200 MW · 6.2 mi awayMMH 4 SW corner Mobile crane for picking (Dekalb data centre) — Filed · Large load · IL · 11.4 mi awayRed Maple LRE — Filed · Solar · IL · 95 MW · 11.6 mi awayMMH2 NE corner Mobile crane for picking (Dekalb data centre) — Filed · Large load · IL · 12.1 mi awayALLSTATE DATA CENTER — Built · Large load · IL · 14.2 mi awayTHE NORTHERN TRUST CO — Built · Large load · IL · 14.2 mi away
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

FPL Energy Illinois Wind LLC Hybrid

Power plant · Wind

Key facts

Power plant · Windran 30% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2025
630,227 MWh
Grid
138 kV to Commonwealth Edison Co (PJM)
Location
DeKalb County, Illinois
Operated by
FPL Energy Illinois Wind LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2009 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Wind source: “Onshore Wind Turbine”
Age
17 years since 2009
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000910060
Location id
L100000907458
Eia plant ids
57325
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
138
Transmission owner
Commonwealth Edison Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20252,156,937
Capacity factor, 20250.303
Net generation (MWh), 2025630,227
Balancing authority codePJM

Wind turbines

Turbines
145
Turbine capacity (MW)
217.5
Turbine models
145 GE Wind GE1.5-77
Hub height (m)
80
Rotor diameter (m)
77
Year online
2009

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Steward Creek Solar Phase 1 Announced Solar 6.2 mi 1,200
MMH 4 SW corner Mobile crane for picking (Dekalb data centre) Filed Large load 11.4 mi
Red Maple LRE Filed Solar 11.6 mi 95
MMH2 NE corner Mobile crane for picking (Dekalb data centre) Filed Large load 12.1 mi
ALLSTATE DATA CENTER Built Large load 14.2 mi
THE NORTHERN TRUST CO Built Large load 14.2 mi

Sources EIA-860M · FAA OE/AAA · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Attribution