Show on map
Steward Creek Solar Phase 1THE NORTHERN TRUST CO — Built · Large load · IL · 9.1 mi awayALLSTATE DATA CENTER — Built · Large load · IL · 9.2 mi awayMMH 4 SW corner Mobile crane for picking (Dekalb data centre) — Filed · Large load · IL · 14.1 mi awayRed Maple LRE — Filed · Solar · IL · 95 MW · 14.4 mi awayMMH2 NE corner Mobile crane for picking (Dekalb data centre) — Filed · Large load · IL · 14.8 mi away
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Steward Creek Solar Phase 1

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Lee County, Illinois

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
65301 generator SC1

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as announced in EIA-860M (source status: “(P) Planned for installation, but regulatory approvals not initiated”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
THE NORTHERN TRUST CO Built Large load 9.1 mi
ALLSTATE DATA CENTER Built Large load 9.2 mi
MMH 4 SW corner Mobile crane for picking (Dekalb data centre) Filed Large load 14.1 mi
Red Maple LRE Filed Solar 14.4 mi 95
MMH2 NE corner Mobile crane for picking (Dekalb data centre) Filed Large load 14.8 mi

Sources EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA · EIA-860M

Sources

Attribution