Show on map
Frackville - Siegfried 230 kV — Transmission lineWMPI Pty LLC — Postponed · Coal · PA · 41 MW · 6.7 mi awayTIERPOINT PENNSYLVANIA TWO LLC — Built · Large load · PA · 7.8 mi awayBroad Mountain Wind Project — Postponed · Wind · PA · 80 MW · 8.7 mi awayPA Solar Park — Postponed · Solar · PA · 9.9 MW · 8.9 mi awayPF Onsite BESS — Filed · Storage · PA · 21 MW · 9.2 mi awayTIERPOINT TWO, LLC - TEKPARK FACILITY — Built · Large load · PA · 11.8 mi awayData Center — Filed · Large load · PA · 12.9 mi away
  • Storage
  • Loads
  • In development
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Frackville - Siegfried 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-PA
Owner (as stated)
PPL Electric Utilities

Details

Who’s behind it

Owner
PPL Electric Utilities

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
40
Substations at the ends (as the source names them)
Frackville to Siegfried
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itppl electric utilities
HIFLD line ID150811
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
WMPI Pty LLC Postponed Coal 6.7 mi 41
TIERPOINT PENNSYLVANIA TWO LLC Built Large load 7.8 mi
Broad Mountain Wind Project Postponed Wind 8.7 mi 80
PA Solar Park Postponed Solar 8.9 mi 9.9
PF Onsite BESS Filed Storage 9.2 mi 21
TIERPOINT TWO, LLC - TEKPARK FACILITY Built Large load 11.8 mi
Data Center Filed Large load 12.9 mi

Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA

Sources

Attribution