- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Framingham State University Plant: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Framingham State University Plant
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2024 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2003
- Net generation, 2024
- 84 MWh
- Grid
- 14 kV to NSTAR Electric Company (ISNE)
- Location
- Middlesex County, Massachusetts
- Operated by
- Framingham State UniversitySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2024
- 84
MWh - Fuel burned, 2024
- 543
MMBtu - Capacity factor, 2024
- 0.3
% - Heat rate, 2024
- 6,464
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 41 | 243 | — | 5,927 |
| 2025 (11 of 12 months) | 31 | 242 | — | 7,806 |
| 2024 | 84 | 543 | 0.3% | 6,464 |
| 2023 | 119 | 559 | 0.4% | — |
| 2022 | 127 | 618 | 0.4% | — |
| 2021 | 110 | 1,041 | 0.4% | 9,464 |
| 2020 | 73 | 763 | 0.3% | 10,452 |
| 2019 | 98 | 1,014 | 0.4% | 10,347 |
| 2018 | 84 | 896 | 0.3% | 10,667 |
| 2017 | 98 | 1,186 | 0.4% | 12,102 |
| 2016 | 115 | 1,152 | 0.4% | 10,017 |
| 2015 | 115 | 1,118 | 0.4% | 9,722 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.