Show on map
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
Freeport - Sweeney: route and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Freeport - Sweeney
Petroleum product pipeline
Key facts
Petroleum product pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-TX
- Operated by
- Phillips 66 PipelineSourceEIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 25
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | PHILLIPS 66 PIPELINE |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | Freeport - Sweeney |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Pipelines (as of January 2020)
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Freeport Energy Center Postponed | Gas, combined cycle | 2.9 mi | 180 |
| Bell Creek BESS LLC Contracted | Storage | 6.7 mi | 200.9 |
| Castor Under construction | Storage | 7.9 mi | 200 |
| Second Division Solar Studied | Storage | 8.1 mi | 30 |
| Brazos River BESS LLC Contracted | Storage | 8.7 mi | 180.4 |
| Brazoria Solar I Under construction | Solar | 13.2 mi | 250 |
| Elio Energy LLC Contracted | Storage | 13.5 mi | 205.3 |
| Pledger Under construction | Storage | 14.6 mi | 9.5 |