Freneau - Njt Aberdeen 230 kV — Transmission lineGateway Energy Center, LLC — Postponed · Gas, combined cycle · NJ · 440 MW · 6.1 mi awayMiddlesex Energy Center LLC — Postponed · Gas, combined cycle · NJ · 570 MW · 6.8 mi awayMilltown Onsite BESS — Under construction · Storage · NJ · 13.2 MW · 10.8 mi awayElevate Arthur Kill — Under construction · Storage · NY · 15.1 MW · 11.8 mi awaySwiftsure — Postponed · Storage · NY · 121 MW · 12.4 mi awayBLOOMBERG DATA CENTER — Built · Large load · NJ · 14.5 mi awayStaten Island Energy Storage 1 LLC — Postponed · Storage · NY · 5 MW · 14.7 mi awayMillstone Solar One — Postponed · Solar · NJ · 2.8 MW · 15.0 mi away
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Freneau - Njt Aberdeen 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NJ
Owner (as stated)
Jersey Central Power Light

Details

Who’s behind it

Owner
Jersey Central Power Light

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
2
Substations at the ends (as the source names them)
Freneau to Njt Aberdeen
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itjersey central power light
HIFLD line ID113368
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Gateway Energy Center, LLC Postponed Gas, combined cycle 6.1 mi 440
Middlesex Energy Center LLC Postponed Gas, combined cycle 6.8 mi 570
Milltown Onsite BESS Under construction Storage 10.8 mi 13.2
Elevate Arthur Kill Under construction Storage 11.8 mi 15.1
Swiftsure Postponed Storage 12.4 mi 121
BLOOMBERG DATA CENTER Built Large load 14.5 mi
Staten Island Energy Storage 1 LLC Postponed Storage 14.7 mi 5
Millstone Solar One Postponed Solar 15.0 mi 2.8

Sources EIA-860M · EPA ICIS-Air