Show on map
- Combustion
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- Other infrastructure
Friendswood 138 kV line: route and 10 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Friendswood 138 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 138 kV
- States crossed
- US-TX
- Owner (as stated)
- Texas New Mexico Power
Details
Who’s behind it
- Owner
- Texas New Mexico Power
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 7
- Substations at the ends (as the source names them)
- Friendswood
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | texas new mexico power |
| HIFLD line ID | 308794 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Bocanova Energy Storage II Under construction | Storage | 2.3 mi | 150 |
| Berkman Storage Postponed | Storage | 6.6 mi | 100 |
| Hidden Lakes Postponed | Storage | 9.5 mi | 9.9 |
| Vertus Energy Storage Plant Studied | Storage | 11.4 mi | 204.9 |
| Red Egret Under construction | Storage | 12.2 mi | 310.6 |
| Bodkin BESS Permitted | Storage | 12.4 mi | 75 |
| TX17 Nickel Prairie Storage Postponed | Storage | 13.0 mi | 100 |
| NET Power La Porte Station Studied | Gas, combustion turbine | 13.5 mi | 25.5 |
| Texas Petrochemicals Postponed | Gas, combined cycle | 14.0 mi | 560 |
| Cottonwood Bayou Solar Built | Solar | 14.1 mi | 351.4 |