Show on map
Friona Rural 138 kV line — Transmission lineMariah East — Postponed · Wind · TX · 152.5 MW · 6.8 mi awayMariah South — Postponed · Wind · TX · 210.4 MW · 9.2 mi awayNacero Penwell Solar Energy Center — Postponed · Solar · TX · 200 MW · 13.2 mi away
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Friona Rural 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Southwestern Public Service

Details

Who’s behind it

Owner
Southwestern Public Service

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
0
Substations at the ends (as the source names them)
Friona Rural
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itsouthwestern public service
HIFLD line ID305650
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Mariah East Postponed Wind 6.8 mi 152.5
Mariah South Postponed Wind 9.2 mi 210.4
Nacero Penwell Solar Energy Center Postponed Solar 13.2 mi 200

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution