Show on map
Frontier Windpower — Power plant · Wind · Deriva EnergyChilocco Wind Farm — Postponed · Wind · OK · 169.2 MW · 11.1 mi awayPonca City Refinery — Postponed · Gas, other · OK · 5 MW · 11.6 mi away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Frontier Windpower

Power plant · Wind

Key facts

Power plant · Windran 28% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
484,545 MWh
Grid
345 kV to Oklahoma Gas & Electric Co (SPA)
Location
Kay County, Oklahoma
Operated by
Deriva Energy

Output

Net generation MWh by year, 2016 to 2026

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
10 years since 2016
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
345
Transmission owner
Oklahoma Gas & Electric Co
Balancing authority code
SPA
Balancing authority name
Southwestern Power Administration
Fuel burned (MMBtu), 20251,653,266
Capacity factor, 20250.277
Net generation (MWh), 2025484,545
Balancing authority codeSPA

Wind turbines

Turbines
61
Turbine capacity (MW)
199.8
Turbine models
5 Vestas V126-3.0 and 56 Vestas V126-3.3
Hub height (m)
87
Rotor diameter (m)
126
Year online
2016

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Deriva Energy Operator EIA-860M
Frontier Windpower, LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Chilocco Wind Farm Postponed Wind 11.1 mi 169.2
Ponca City Refinery Postponed Gas, other 11.6 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution