Show on map
Fruita — Power plant · Gas, combustion turbine · Public Service Co of ColoradoGrand Valley Solar Generation and BESS — Solar + storage · CO · 200 MW · 8.0 km away
  • Combustion
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 1% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1973
Net generation, 2025
1,781 MWh
Grid
69 kV to Public Service Co of Colorado (PSCO)
Location
Mesa County, Colorado
Operated by
Public Service Co of ColoradoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
53 years since 1973
Heat rate
20,276 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 202536,112
Capacity factor, 20250.008
Heat rate (Btu/kWh), 202520,276.2
Net generation (MWh), 20251,781
Balancing authority codePSCO

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
December 2028
Capacity scheduled to retire
26.6 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
100%
Capacity still in service
26.6 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Fired Combustion Turbine26.6 MWScheduled to retireDecember 2028

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Public Service Co of Colorado
Balancing authority
Public Service Company of Colorado
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 1 scheduled to retire, 26.6 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Grand Valley Solar Generation and BESS Filed Solar + storage 8.0 km 200

Sources EIA-860M

Sources

Attribution