Fullerton
Petroleum product pipeline
Key facts
Petroleum product pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-PA
- Operated by
- SunocoSourceEIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 47
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | SUNOCO |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | Fullerton |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Pipelines (as of January 2020)
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| THE DATA CENTERS Under construction | Large load | 0.2 mi | |
| FLEXENTIAL/ UPPER PROVIDENCE TWP Built | Large load | 5.3 mi | |
| TIERPOINT PENNSYLVANIA TWO LLC Built | Large load | 5.9 mi | |
| TIERPOINT TWO, LLC - TEKPARK FACILITY Built | Large load | 6.1 mi | |
| VALLEY FORGE DIGITAL UTILITY FACILITY / LOWER PROVIDENCE Built | Large load | 8.5 mi | |
| CSL BEHRING DATA CTR/KING OF PRUSSIA Built | Large load | 9.1 mi | |
| Pioneer Crossing Energy, LLC Postponed | Biomass | 12.8 mi | 3.2 |
| INNOVATION 2201 LLC / UPPER MERION TWP Built | Large load | 12.8 mi | |
| PPL Glendon LFGTE Plant Postponed | Biomass | 13.2 mi | 1.6 |
| West Point (PA) Under construction | Gas, reciprocating engine | 14.7 mi | 2.5 |
Sources EPA ICIS-NPDES · EPA ICIS-Air · EIA-860M