- Combustion
- Retired
- 10 · 100 · 1,000 MW
Map
- Combustion
- Retired
G E Turner: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
G E Turner
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2015 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1970
- Net generation, 2015
- 646 MWh
- Grid
- 115 kV to Duke Energy Florida, Inc (FPC)
- Location
- Volusia County, Florida
- Operated by
- Duke Energy Florida, LLC
Output
- Oil
Details
Who’s behind it
- Owner
- Duke Energy
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 56 years since 1970
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | FPC |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- March 2016
- First unit retired
- July 2015
- Capacity retired
- 180.8 MW
- Generators retired
- 4
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| P3 | Petroleum Liquids | 71.2 MW | Retired | July 2015 |
| P1 | Petroleum Liquids | 19.2 MW | Retired | March 2016 |
| P2 | Petroleum Liquids | 19.2 MW | Retired | March 2016 |
| P4 | Petroleum Liquids | 71.2 MW | Retired | March 2016 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV
- Transmission or distribution system owner
- Duke Energy Florida, Inc
- Balancing authority
- Progress Energy Florida
- NERC region
- SERC
Transmission lines within 25 km (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Duke Energy Florida, LLC | Operator | EIA-860M | ||
| Duke Energy | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Units P1, P2, P4 scheduled to retire, 109.6 MW · EIA-860M
- Stated Unit P3 scheduled to retire, 71.2 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)