G E Turner — Power plant · Oil · Duke Energy Florida, LLC
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2015 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1970
Net generation, 2015
646 MWh
Grid
115 kV to Duke Energy Florida, Inc (FPC)
Location
Volusia County, Florida

Output

Net generation MWh by year, 2001 to 2016
Fuel burned MMBtu by year, 2001 to 2016
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
56 years since 1970
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110002524787
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007373
Balancing authority codeFPC

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
March 2016
First unit retired
July 2015
Capacity retired
180.8 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
P3Petroleum Liquids71.2 MWRetiredJuly 2015
P1Petroleum Liquids19.2 MWRetiredMarch 2016
P2Petroleum Liquids19.2 MWRetiredMarch 2016
P4Petroleum Liquids71.2 MWRetiredMarch 2016

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Duke Energy Florida, Inc
Balancing authority
Progress Energy Florida
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Duke Energy Florida, LLC Operator EIA-860M
Duke Energy Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units P1, P2, P4 scheduled to retire, 109.6 MW · EIA-860M
  • Stated Unit P3 scheduled to retire, 71.2 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)