Show on map
Gallatin #2 — Power plant · Oil · City of Gallatin - (MO)
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Gallatin #2

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2003 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2001
Net generation, 2003
62 MWh
Grid
SWPP
Location
Daviess County, Missouri

Output

Net generation MWh by year, 2002 to 2003
Fuel burned MMBtu by year, 2002 to 2003
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
25 years since 2001
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeSWPP

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2003
First unit retired
August 2003
Capacity retired
3.6 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
7Petroleum Liquids1.8 MWRetiredAugust 2003
8Petroleum Liquids1.8 MWRetiredSeptember 2003

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Balancing authority
Southwest Power Pool
NERC region
MRO
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleAs ofSource
City of Gallatin - (MO) Operator EIA-860M
Dean Machinery Owner Dec 31, 2025 EIA-860

Timeline

  • Stated Unit 8 scheduled to retire, 1.8 MW · EIA-860M
  • Stated Unit 7 scheduled to retire, 1.8 MW · EIA-860M
  • In service · EIA-860M