Show on map
Gaston Memorial Hospital — Power plant · Oil · City of Gastonia - (NC)DLR Moores Chapel Mobile Crane (Charlotte data centre) — Filed · Large load · NC · 8.2 mi awayAllen 2 BESS — Announced · Storage · NC · 167 MW · 9.2 mi awayHornet Solar — Under construction · Solar · NC · 73 MW · 9.9 mi awayMcDowell Creek Solar LLC — Under construction · Solar · NC · 2 MW · 13.7 mi awayBELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA — Built · Large load · NC · 14.0 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Gaston Memorial Hospital

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2006
Net generation, 2025
22 MWh
Grid
12 kV to City of Gastonia - (NC) (DUK)
Location
Gaston County, North Carolina

Output

Net generation MWh by year, 2011 to 2026
Fuel burned MMBtu by year, 2011 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
20 years since 2006
Unused energy
16 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
12,136 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
City of Gastonia - (NC)
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 2025267
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202512,136.4
Net generation (MWh), 202522
Balancing authority codeDUK

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
City of Gastonia - (NC) Operator EIA-860M
Gaston Memorial Hospital Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
DLR Moores Chapel Mobile Crane (Charlotte data centre) Filed Large load 8.2 mi
Allen 2 BESS Announced Storage 9.2 mi 167
Hornet Solar Under construction Solar 9.9 mi 73
McDowell Creek Solar LLC Under construction Solar 13.7 mi 2
BELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA Built Large load 14.0 mi

Sources FAA OE/AAA · EIA-860M · EPA ICIS-Air

Sources

Attribution