Gavilan Community College Solar Project — Power plant · Solar · Gavilan District College Solar ProjectRenz Energy Storage — Postponed · Storage · CA · 20 MW · 2.0 mi awayAWS DATA CENTER GILROY - SFO069 — Large load · CA · 2.1 mi awayGilroy Data Center - Temp Crane — Filed · Large load · CA · 2.5 mi awayCrazy Horse Solar Project — Postponed · Solar · CA · 2 MW · 13.9 mi awayCA Moss Landing 3040 Hilltop Rd — Postponed · Solar + storage · CA · 2.2 MW · 13.9 mi away
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Gavilan Community College Solar Project

Power plant · Solar

Key facts

Power plant · Solarran 13% of 2021 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2021
2,230 MWh
Grid
4 kV to Pacific Gas & Electric Co. (CISO)
Location
Santa Clara County, California

Output

Net generation MWh by year, 2018 to 2021

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815814
Location id
L100000813128
Eia plant ids
61993
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
4.20
Transmission owner
Pacific Gas & Electric Co.
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Balancing authority codeCISO

Solar arrays

Array area (acres)
2.7
AC capacity (MW)
1.4
DC capacity (MW)
1.4
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Gavilan District College Solar Project Operator EIA-860M
SolarStorage Fund C, LLC Owner 26.3% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Renz Energy Storage Postponed Storage 2.0 mi 20
AWS DATA CENTER GILROY - SFO069 Unknown Large load 2.1 mi
Gilroy Data Center - Temp Crane Filed Large load 2.5 mi
Crazy Horse Solar Project Postponed Solar 13.9 mi 2
CA Moss Landing 3040 Hilltop Rd Postponed Solar + storage 13.9 mi 2.2

Sources EIA-860M · EPA ICIS-NPDES · FAA OE/AAA

Sources

Attribution