Geneva — Power plant · Biomass · WM Renewable Energy LLC
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Biomass

Key facts

Power plant · Biomassran 47% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
16,382 MWh
Grid
36 kV to Ohio Edison Co (PJM)
Location
Ashtabula County, Ohio

Output

Net generation MWh by year, 2013 to 2025
Fuel burned MMBtu by year, 2013 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
13 years since 2013
Heat rate
12,562 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
36
Transmission owner
Ohio Edison Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110011942979
Subparts reported
C, HH
NAICS code
562212
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1003392
Fuel burned (MMBtu), 2025205,785
Capacity factor, 20250.468
Heat rate (Btu/kWh), 202512,561.7
Net generation (MWh), 202516,382
Balancing authority codePJM

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
WM Renewable Energy LLC Operator EIA-860M
WASTE MANAGEMENT INC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M