Show on map
George Johnson — Power plant · Gas, combustion turbine · Wolverine Power Supply Coop
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

George Johnson

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 10% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1993
Net generation, 2025
42,719 MWh
Grid
69 kV to Wolverine Power Supply Coop (MISO)
Location
Osceola County, Michigan
Operated by
Wolverine Power Supply CoopSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Owner
Wolverine Power Supply CoopSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
33 years since 1993
Unused energy
404 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
11,002 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110070082523
Subparts reported
C
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1012840
Eia status
By code
OP
Mw
50
Units
2
SB
Mw
1
Units
1
Standby mw
1
Status rule
some_units_retired
In service mw
51
Out of service mw
0
Fuel burned (MMBtu), 2025470,012
Capacity factor, 20250.096
Heat rate (Btu/kWh), 202511,002.4
Net generation (MWh), 202542,719
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
32 MW
Generators retired
8
Capacity still in service
51 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Internal Combustion Engine0.7 MWRetiredJanuary 2002
2Natural Gas Internal Combustion Engine0.7 MWRetiredJanuary 2002
3Natural Gas Internal Combustion Engine1.1 MWRetiredJanuary 2002
4Natural Gas Internal Combustion Engine2.5 MWRetiredJanuary 2002
5Natural Gas Internal Combustion Engine2.5 MWRetiredJanuary 2002
6Natural Gas Internal Combustion Engine2.5 MWRetiredJanuary 2002
7Natural Gas Fired Combustion Turbine11 MWRetiredOctober 2005
8Natural Gas Fired Combustion Turbine11 MWRetiredOctober 2005
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Fired Combustion Turbine22 MW
Natural Gas Internal Combustion Engine10 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Wolverine Power Supply Coop
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
Transmission lines within 15 mi (3)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 7, 8 scheduled to retire, 22 MW · EIA-860M
  • Stated Units 1, 2, 3, 4, 5, 6 scheduled to retire, 10 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source