Show on map
Georgia-Pacific Big Island — Power plant · Gas, steam turbine · GP Big Island LLCCENTRA HEALTH ADMINISTRATION - DATA CENT — Built · Large load · VA · 13.1 mi away
  • Combustion
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Georgia-Pacific Big Island

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 52% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1920
Net generation, 2025
35,910 MWh
Grid
69 kV to Appalachian Power Co (PJM)
Location
Bedford County, Virginia

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil
  • Biomass and waste
  • Unspecified fuel

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
106 years since 1920
Unused energy
33 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
69
Transmission owner
Appalachian Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000343922
Subparts reported
AA, C, TT
NAICS code
322130
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000273
Fuel burned (MMBtu), 20254,791,994
Capacity factor, 20250.519
Net generation (MWh), 202535,910
Balancing authority codePJM
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 133444.6 outside 5000-30000 Btu/kWh

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
GP Big Island LLC Operator EIA-860M
KOCH INDUSTRIES INC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CENTRA HEALTH ADMINISTRATION - DATA CENT Built Large load 13.1 mi

Sources EPA ICIS-Air

Sources

Attribution