Show on map
Georgia-Pacific Cedar Springs — Power plant · Biomass · Georgia-Pacific Cedar Springs LLC
  • Bioenergy
  • Retired
  • 10 · 100 · 1,000 MW

Georgia-Pacific Cedar Springs

Power plant · Biomass

Key facts

Power plant · Biomassran 61% of 2024 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1963
Net generation, 2024
541,012 MWh
Grid
115 kV to Georgia Power Co (SOCO)
Location
Early County, Georgia

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Coal
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Wood/Wood Waste Biomass”
Age
63 years since 1963
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Koch Industries LLC
Share pct
42
Gem entity id
E100000001246
Unit ids
G100000201584, G100000201585
Location id
L100000201325
Eia plant ids
54101
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071159798
Subparts reported
AA, C, TT
NAICS code
322130
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1002823
Fuel burned (MMBtu), 20259,668,157
Capacity factor, 20250.308
Net generation (MWh), 2025273,084.7
Balancing authority codeSOCO
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 35403.5 outside 5000-30000 Btu/kWh

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
July 2025
Capacity retired
101.2 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Wood/Wood Waste Biomass50 MWRetiredJuly 2025
GEN2Wood/Wood Waste Biomass51.2 MWRetiredJuly 2025

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Georgia Power Co
Balancing authority
Southern Company Services, Inc. - Trans
NERC region
SERC
Transmission lines within 15 mi (5)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Georgia-Pacific Cedar Springs LLC Operator EIA-860M
KOCH INDUSTRIES INC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units GEN1, GEN2 scheduled to retire, 101.2 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Every source and license · Attribution

View at source