Getzville 115 kV line — Transmission lineNYSolar06 — Under construction · Solar · NY · 3.5 MW · 4.2 mi awayBear Ridge — Filed · Solar · NY · 93 MW · 8.1 mi awayKCE NY 10, LLC — Announced · Storage · NY · 20 MW · 9.1 mi awayModern Innovative Energy LLC — Postponed · Biomass · NY · 6.4 MW · 14.9 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Getzville 115 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-NY
Owner (as stated)
Niagara Mohawk Power

Details

Who’s behind it

Owner
Niagara Mohawk Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
11
Substations at the ends (as the source names them)
Getzville
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itniagara mohawk power
HIFLD line ID157004
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
NYSolar06 Under construction Solar 4.2 mi 3.5
Bear Ridge Filed Solar 8.1 mi 93
KCE NY 10, LLC Announced Storage 9.1 mi 20
Modern Innovative Energy LLC Postponed Biomass 14.9 mi 6.4

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution