Show on map
GFTX BESS — Power plant · Storage · GIGA TEXAS ENERGY LLCAustin TX GigaFactory — Under construction · Solar · TX · 2.3 MW · 0.6 mi awayAustin TX GigaFactory — Postponed · Solar · TX · 1 MW · 0.6 mi awayAMD Phase 2 (Austin data centre) — Filed · Large load · TX · 4.5 mi awaySMT DC Austin I (Austin data centre) — Filed · Large load · TX · 5.5 mi awayPecan Crossing Building 2 (Pflugerville data centre) — Filed · Large load · TX · 13.1 mi awayDogwood Creek Solar and BESS — Postponed · Solar + storage · TX · 878.7 MW · 14.1 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
-17,298 MWh
Grid
345 kV to Lower Colorado River Authority (ERCO)
Location
Travis County, Texas
Operated by
GIGA Texas Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
345
Transmission owner
Lower Colorado River Authority
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-17,298
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -17298.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Austin TX GigaFactory × 2 units Under construction Solar 0.6 mi 3.3
AMD Phase 2 (Austin data centre) Filed Large load 4.5 mi
SMT DC Austin I (Austin data centre) Filed Large load 5.5 mi
Pecan Crossing Building 2 (Pflugerville data centre) Filed Large load 13.1 mi
Dogwood Creek Solar and BESS Postponed Solar + storage 14.1 mi 878.7

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 9, 2026

Attribution