Show on map
Gilead Foster City Solar Project — Power plant · Solar · Gilead Sciences Inc. Foster CitySan Francisco Intl Airport Ct Project — Postponed · Gas, combustion turbine · CA · 48 MW · 7.4 mi awayAmeresco Ox Mountain — Filed · Biomass · CA · 3 MW · 8.2 mi awayHAYWARD DATA CENTER — Large load · CA · 9.8 mi awaySan Leandro 10 - sleba702 — Under construction · Solar · CA · 1 MW · 11.3 mi awayGateway#1&2 (Newark CA) — Announced · Solar · CA · 1.1 MW · 12.0 mi away7999 Gateway Solar — Under construction · Solar · CA · 4.6 MW · 13.5 mi away
  • Wind & solar
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Gilead Foster City Solar Project

Power plant · Solar

Key facts

Power plant · Solarran 13% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
1,890 MWh
Grid
0.5 kV to Pacific Gas & Electric Co. (CISO)
Location
San Mateo County, California
Operated by
Gilead Sciences Inc. Foster CitySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
5 years since 2021
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
0.500
Transmission owner
Pacific Gas & Electric Co.
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20256,584
Capacity factor, 20250.135
Net generation (MWh), 20251,890
Balancing authority codeCISO

Solar array

Array area (acres)
1.7
AC capacity (MW)
1.1
DC capacity (MW)
1.3
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2021

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
San Francisco Intl Airport Ct Project Postponed Gas, combustion turbine 7.4 mi 48
Ameresco Ox Mountain Filed Biomass 8.2 mi 3
HAYWARD DATA CENTER Unknown Large load 9.8 mi
San Leandro 10 - sleba702 Under construction Solar 11.3 mi 1
Gateway#1&2 (Newark CA) Announced Solar 12.0 mi 1.1
7999 Gateway Solar Under construction Solar 13.5 mi 4.6

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution