Gilman Mill — Power plant · Hydro · Ampersand Gilman Hydro LPSECURED NETWORK SERVICES, INC. — Built · Large load · NH · 9.1 mi away
  • Clean firm
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Gilman Mill

Power plant · Hydro

Key facts

Power plant · Hydroran 5% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1941
Net generation, 2025
2,168 MWh
Grid
34 kV to Green Mountain Power Corp (ISNE)
Location
Essex County, Vermont
Operated by
Ampersand Gilman Hydro LPSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
85 years since 1941
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 20257,398
Capacity factor, 20250.052
Net generation (MWh), 20252,168
Balancing authority codeISNE

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
4 MW
Generators retired
1
Capacity still in service
4.8 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN5Wood/Wood Waste Biomass4 MWRetiredJanuary 2014

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
34 kV
Transmission or distribution system owner
Green Mountain Power Corp
Balancing authority
ISO New England Inc.
NERC region
NPCC
Transmission lines within 15 mi (9)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit GEN5 scheduled to retire, 4 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SECURED NETWORK SERVICES, INC. Built Large load 9.1 mi

Sources EPA ICIS-Air