Show on map
Goldfinch — Power plant · Solar · Goldfinch (Lakeland)Mattaniah Solar — Under construction · Solar · FL · 52 MW · 9.9 km awayLKL Kingfisher, LLC — Postponed · Solar · FL · 6 MW · 15.7 km awayC D McIntosh Jr — Postponed · Oil · FL · 304 MW · 16.0 km away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 18% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
4,838 MWh
Grid
12 kV to City of Lakeland - (FL) (FMPP)
Location
Polk County, Florida
Operated by
Goldfinch (Lakeland)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
10 years since 2016
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815883
Location id
L100000813192
Eia plant ids
60124
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
City of Lakeland - (FL)
Balancing authority code
FMPP
Balancing authority name
Florida Municipal Power Pool
Fuel burned (MMBtu), 202516,509
Capacity factor, 20250.184
Net generation (MWh), 20254,838
Balancing authority codeFMPP

Solar arrays

Array area (acres)
19.2
AC capacity (MW)
3
DC capacity (MW)
3.7
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2016

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Mattaniah Solar Under construction Solar 9.9 km 52
LKL Kingfisher, LLC Postponed Solar 15.7 km 6
C D McIntosh Jr Postponed Oil 16.0 km 304

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution