Show on map
- Combustion
- Clean firm
- Wind & solar
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Clean firm
- Wind & solar
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
Goldline: route and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Goldline
Petroleum product pipeline
Key facts
Petroleum product pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-IL, US-KS, US-MO, US-TX
- Operated by
- Phillips 66 PipelineSourceEIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 716
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | PHILLIPS 66 PIPELINE |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | Goldline |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Pipelines (as of January 2020)
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Osawatomie Postponed | Gas, combustion turbine | 1.4 mi | 639.1 |
| Majestic 2 Wind Farm Postponed | Wind | 5.2 mi | 79.2 |
| SV CSG East St Louis Under construction | Solar | 5.9 mi | 5 |
| Castle Bluff Energy Center Announced | Gas, combustion turbine | 6.8 mi | 648 |
| Carol Wind, LLC Permitted | Wind | 9.6 mi | 167.8 |
| Project Matador Gas Plant (PMG) Under construction | Gas, combined cycle | 11.4 mi | 11,679.3 |
| Project Matador Nuclear Announced | Nuclear | 11.4 mi | 4,468 |
| OPPIDAN DATA CENTER Under construction | Large load | 12.6 mi |
Sources EIA-860M · EPA ICIS-NPDES