Show on map
Goldline — Petroleum product pipeline · PHILLIPS 66 PIPELINEOsawatomie — Postponed · Gas, combustion turbine · KS · 639.1 MW · 1.4 mi awayMajestic 2 Wind Farm — Postponed · Wind · TX · 79.2 MW · 5.2 mi awaySV CSG East St Louis — Under construction · Solar · IL · 5 MW · 5.9 mi awayCastle Bluff Energy Center — Announced · Gas, combustion turbine · MO · 648 MW · 6.8 mi awayCarol Wind, LLC — Permitted · Wind · TX · 167.8 MW · 9.6 mi awayProject Matador Gas Plant (PMG) — Under construction · Gas, combined cycle · TX · 11,679.3 MW · 11.4 mi awayProject Matador Nuclear — Announced · Nuclear · TX · 4,468 MW · 11.4 mi awayOPPIDAN DATA CENTER — Under construction · Large load · MO · 12.6 mi away
  • Combustion
  • Clean firm
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Petroleum product pipeline

Key facts

Petroleum product pipeline Operating
Mapped route length
Mapped route length: sourceEIA Energy Atlas · Open licensemiles
States crossed
US-IL, US-KS, US-MO, US-TX
Operated by
Phillips 66 PipelineSourceEIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
716
Units
1
All 5 attributes from EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Attributes
AttributeValue
Mapped parts1
Operator, as the source states itPHILLIPS 66 PIPELINE
Mapped segments1
Source release202001
Pipeline name rawGoldline

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)

Sources

Every source and license · Attribution

View at source

Around this pipeline

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Osawatomie Postponed Gas, combustion turbine 1.4 mi 639.1
Majestic 2 Wind Farm Postponed Wind 5.2 mi 79.2
SV CSG East St Louis Under construction Solar 5.9 mi 5
Castle Bluff Energy Center Announced Gas, combustion turbine 6.8 mi 648
Carol Wind, LLC Permitted Wind 9.6 mi 167.8
Project Matador Gas Plant (PMG) Under construction Gas, combined cycle 11.4 mi 11,679.3
Project Matador Nuclear Announced Nuclear 11.4 mi 4,468
OPPIDAN DATA CENTER Under construction Large load 12.6 mi

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution