- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Goldsmith: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Goldsmith
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2013
- Net generation, 2025
- 101 MWh
- Grid
- 138 kV to Oncor Electric Delivery Company LLC (ERCO)
- Location
- Ector County, Texas
- Operated by
- Power Depot Group A, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 101
MWh - Fuel burned, 2025
- 1,016
MMBtu - Capacity factor, 2025
- 0.1
% - Heat rate, 2025
- 10,059
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 101 | 1,016 | 0.1% | 10,059 |
| 2024 | 184 | 1,897 | 0.2% | 10,310 |
| 2023 | 670 | 6,224 | 0.9% | 9,290 |
| 2022 | 424 | 4,024 | 0.5% | 9,483 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.