Show on map
Gonder - Machacek 230 kV — Transmission lineRobinson Solar — Announced · Solar + storage · NV · 600 MW · 8.3 mi awayEly Energy Center — Postponed · Coal · NV · 1,500 MW · 11.1 mi away
  • Wind & solar
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Gonder - Machacek 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NV
Owner (as stated)
Mt Wheeler Power

Details

Who’s behind it

Owner
Mt Wheeler Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
67
Substations at the ends (as the source names them)
Gonder to Machacek
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itmt wheeler power
HIFLD line ID309146
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Robinson Solar Announced Solar + storage 8.3 mi 600
Ely Energy Center Postponed Coal 11.1 mi 1,500

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution