Show on map
Goshen 230 kV line — Transmission lineForeman Solar — Postponed · Solar · SC · 6.4 MW · 10.2 mi awayJackson Solar — Postponed · Solar · SC · 14 MW · 11.6 mi away
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Goshen 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-GA
Owner (as stated)
Georgia Power

Details

Who’s behind it

Owner
Georgia Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
8
Substations at the ends (as the source names them)
Goshen
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itgeorgia power
HIFLD line ID123945
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Foreman Solar Postponed Solar 10.2 mi 6.4
Jackson Solar Postponed Solar 11.6 mi 14

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution