Show on map
Granite Peak Solar Plant — Power plant · Solar · Evergreen Wind, LLCMilford Wind Corridor Phase III — Postponed · Wind · UT · 100 MW · 1.3 mi awayCape Generating Station — Under construction · Geothermal · UT · 43 MW · 8.2 mi awayCape Generating Station — Under construction · Geothermal · UT · 86 MW · 8.2 mi awayMilford Solar Phase II — Under construction · Solar · UT · 310 MW · 8.4 mi awayBlundell — Postponed · Geothermal · UT · 30 MW · 9.4 mi awayRodatherm Milford 1 — Under construction · Geothermal · UT · 1.8 MW · 11.8 mi away
  • Clean firm
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Granite Peak Solar Plant

Power plant · Solar

Key facts

Power plant · Solarran 23% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2025
6,092 MWh
Grid
12 kV to PacifiCorp (PACE)
Location
Beaver County, Utah
Operated by
Evergreen Wind, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2015 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
11 years since 2015
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815906
Location id
L100000813214
Eia plant ids
58604
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12.50
Transmission owner
PacifiCorp
Balancing authority code
PACE
Balancing authority name
PacifiCorp - East
Fuel burned (MMBtu), 202520,786
Capacity factor, 20250.232
Net generation (MWh), 20256,092
Balancing authority codePACE

Solar array

Array area (acres)
14.6
AC capacity (MW)
3
DC capacity (MW)
3.4
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2015

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Milford Wind Corridor Phase III Postponed Wind 1.3 mi 100
Cape Generating Station × 2 units Under construction Geothermal 8.2 mi 129
Milford Solar Phase II Under construction Solar 8.4 mi 310
Blundell Postponed Geothermal 9.4 mi 30
Rodatherm Milford 1 Under construction Geothermal 11.8 mi 1.8

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution