Show on map
Graniterock Quarry — Power plant · Solar · CalCom EnergyCrazy Horse Solar Project — Postponed · Solar · CA · 2 MW · 5.3 mi awayRenz Energy Storage — Postponed · Storage · CA · 20 MW · 9.3 mi awayGilroy Data Center - Temp Crane — Filed · Large load · CA · 9.4 mi awayCA Moss Landing 3040 Hilltop Rd — Postponed · Solar + storage · CA · 2.2 MW · 9.7 mi awayAWS DATA CENTER GILROY - SFO069 — Large load · CA · 9.8 mi awayMarina Landfill Gas — Announced · Biomass · CA · 6.4 MW · 14.6 mi away
  • Wind & solar
  • Bioenergy
  • Loads
  • In development
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Graniterock Quarry

Power plant · Solar

Key facts

Power plant · Solarran 23% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
8,798 MWh
Grid
60 kV to Pacific Gas & Electric Co. (CISO)
Location
San Benito County, California
Operated by
CalCom Energy

Output

Net generation MWh by year, 2022 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
4 years since 2022
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815907
Location id
L100000813215
Eia plant ids
65485
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
60
Transmission owner
Pacific Gas & Electric Co.
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 202530,020
Capacity factor, 20250.228
Net generation (MWh), 20258,798
Balancing authority codeCISO

Solar array

Array area (acres)
14.6
AC capacity (MW)
4.4
DC capacity (MW)
5.7
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2022

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
CalCom Energy Operator EIA-860M
Granite Rock Company Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Crazy Horse Solar Project Postponed Solar 5.3 mi 2
Renz Energy Storage Postponed Storage 9.3 mi 20
Gilroy Data Center - Temp Crane Filed Large load 9.4 mi
CA Moss Landing 3040 Hilltop Rd Postponed Solar + storage 9.7 mi 2.2
AWS DATA CENTER GILROY - SFO069 Unknown Large load 9.8 mi
Marina Landfill Gas Announced Biomass 14.6 mi 6.4

Sources EIA-860M · FAA OE/AAA · EPA ICIS-NPDES

Sources

Attribution