Show on map
Great Lakes Gas Trans Co — Gas pipeline · Great Lakes Gas Trans CoSuperior Generation Energy Center — Postponed · Gas, combustion turbine · WI · 170 MW · 5.9 mi away
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Great Lakes Gas Trans Co

Gas pipeline · intrastate

Key facts

Gas pipeline · intrastate Operating
Mapped route length
Mapped route length: sourceEIA Energy Atlas · Open licensemiles
Class
intrastate
States crossed
US-WI
Operated by
Great Lakes Gas Trans CoSourceEIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Pipeline class
intrastate
Mapped route length (miles)
26Two lengthsMapped route length is this pipeline’s route as mapped (EIA Energy Atlas); onshore transmission miles under Attributes is what the operator reported to PHMSA for 2025 for its whole onshore gas transmission system, so the two need not agree.
Technology
Intrastate source: “Intrastate”
Units
1
All 5 attributes from EIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
Attributes
AttributeValue
PHMSA operator annual report
PHMSA operator ID
6660
Report year
2025
Operator, as PHMSA names it
GREAT LAKES GAS TRANSMISSION LIMITED PARTNERSHIP
Years with an incident
2021, 2022, 2023, 2024, 2025
Miles by decade installed
1960s
1,012.7
1970s
188.6
1980s
284.0
1990s
612.9
2000s
15.43
2010s
1.18
2020s
0.060
Miles by diameter (inches)
6
0.090
10
44.45
12
44.69
14
0
20
0.020
24
10.54
30
0.040
36
2,015.0
42
0.010
Incidents, last 5 years
2
Incidents with an injury, last 5 years
0
Incidents with a fatality, last 5 years
0
Incidents with ignition, last 5 years
0
Onshore transmission miles
2,114.8
Incidents with an explosion, last 5 years
0
Mapped parts1
Status, as the source states itOperating
Mapped segments1
Source release202001
Data notes (1)
  • Significant incidents, last 5 years not shown: PHMSA's significant flag is published in PHMSA_Pipeline_Safety_Flagged_Incidents.zip, which could not be retrieved; the public incident file carries neither the flag nor the 1984-dollar cost its definition uses

Around this pipeline

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Superior Generation Energy Center Postponed Gas, combustion turbine 5.9 mi 170

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution