Greater New Bedford LFG Utiliz. Facility
- Bioenergy
- Operating
- 10 · 100 · 1,000 MW
Map
- Bioenergy
- Operating
Greater New Bedford LFG Utiliz. Facility: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Greater New Bedford LFG Utiliz. Facility
Power plant · Biomass
Key facts
Power plant · Biomassran 46% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2005
- Net generation, 2025
- 13,411 MWh
- Grid
- 13 kV to NSTAR Electric Company (ISNE)
- Location
- Bristol County, Massachusetts
- Operated by
- CommonWealth New Bedford Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 13,411
MWh - Fuel burned, 2025
- 192,785
MMBtu - Capacity factor, 2025
- 46.4
% - Heat rate, 2025
- 14,375
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 13,411 | 192,785 | 46.4% | 14,375 |
| 2024 | 16,881 | 245,110 | 58.2% | 14,520 |
| 2023 | 19,855 | 282,604 | 68.7% | 14,233 |
| 2022 | 21,160 | 293,856 | 73.2% | 13,887 |
| 2021 | 17,236 | 225,541 | 59.6% | 13,086 |
| 2020 | 17,237 | 218,590 | 59.5% | 12,681 |
| 2019 | 15,770 | 181,184 | 54.5% | 11,489 |
| 2018 | 14,473 | 182,000 | 50.1% | 12,575 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.