Show on map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
Greater New Bedford LFG Utiliz. Facility: location and 16 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Greater New Bedford LFG Utiliz. Facility
Power plant · Biomass
Key facts
Power plant · Biomassran 46% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2005
- Net generation, 2025
- 13,411 MWh
- Grid
- 13 kV to NSTAR Electric Company (ISNE)
- Location
- Bristol County, Massachusetts
- Operated by
- CommonWealth New Bedford Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Technology
- Biomass source: “Landfill Gas”
- Age
- 21 years since 2005
- Heat rate
- 14,375 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 192,785 |
| Capacity factor, 2025 | 0.464 |
| Heat rate (Btu/kWh), 2025 | 14,375.1 |
| Net generation (MWh), 2025 | 13,411 |
| Balancing authority code | ISNE |
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Clems Way Solar Permitted | Solar | 4.4 mi | 5 |
| MA Acushnet 540R Main St Filed | Solar + storage | 4.8 mi | 6 |
| Featherbed Lane South Solar Under construction | Solar + storage | 4.9 mi | 2 |
| Braley Hill North Solar Under construction | Solar + storage | 5.2 mi | 10 |
| Cushman Road Solar Filed | Solar + storage | 5.3 mi | 6 |
| Snipatuit Road Solar Under construction | Solar + storage | 5.8 mi | 8 |
| Logging Swamp North Permitted | Solar | 6.1 mi | 5 |
| Logging Swamp South Permitted | Solar | 6.1 mi | 5 |
| Borrego - Highland Ave Under construction | Solar + storage | 6.1 mi | 10 |
| BlueWave Capital-Mattapoisett (SREC II) Postponed | Solar | 7.9 mi | 4.5 |
| Randall Lane Solar Under construction | Solar + storage | 8.1 mi | 10 |
| Salt Cod BESS Filed | Storage | 8.9 mi | 168 |
| CONGRUITY 360 LLC Built | Large load | 8.9 mi | |
| Tiverton Power Plant Postponed | Gas, combined cycle | 11.5 mi | 289.8 |
| Solar Carver 3 Hybrid Under construction | Solar + storage | 13.4 mi | 2 |
| Solar Carver 1 Hybrid Under construction | Solar + storage | 13.5 mi | 4 |
Sources EIA-860M · EPA ICIS-Air