Show on map
Green City Recovery, LLC — Power plant · Biomass · Green City Recovery, LLC
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Green City Recovery, LLC

Power plant · Biomass

Key facts

Power plant · Biomass Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
0 MWh
Grid
13 kV to Kentucky Utilities Co (LGEE)
Location
Scott County, Kentucky

Output

Net generation MWh by year, 2016 to 2025
Fuel burned MMBtu by year, 2016 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Biomass source: “Landfill Gas”
Age
10 years since 2016
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Kentucky Utilities Co
Balancing authority code
LGEE
Balancing authority name
Louisville Gas and Electric Company and Kentucky Utilities Company
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeLGEE
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Toyota Motor Manufacturing, Kentucky, Inc. Owner 100.0% Dec 31, 2025 EIA-860
Green City Recovery, LLC Operator EIA-860M

Timeline

  • In service · EIA-860M