Show on map
Green Power 2 — Power plant · Gas, combined cycle · South Houston Green Power LLCZeya — Under construction · Storage · TX · 255.3 MW · 1.2 mi awayRed Egret — Under construction · Storage · TX · 310.6 MW · 5.3 mi awayVertus Energy Storage Plant — Studied · Storage · TX · 204.9 MW · 6.5 mi awayHidden Lakes — Postponed · Storage · TX · 9.9 MW · 9.9 mi awayBerkman Storage — Postponed · Storage · TX · 100 MW · 12.3 mi away
  • Combustion
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Green Power 2

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 51% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2025
3,861,166 MWh
Grid
138 kV to Texas-New Mexico Power Co (ERCO)
Location
Galveston County, Texas

Output

Net generation MWh by year, 2003 to 2026
Fuel burned MMBtu by year, 2003 to 2026
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
23 years since 2003
Unused energy
3,681 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
12,112 Btu/kWh 2025
All 9 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Marathon Petroleum Corp
Share pct
100
Gem entity id
E100000001254
Unit ids
G100000401939, G100000409440
Location id
L100000401687
Eia plant ids
55470
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Texas-New Mexico Power Co
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110059763536
Subparts reported
C, D, DD, MM, Y
NAICS code
324110
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1005585
Eia status
By code
OP
Mw
611
Units
4
OS
Mw
250
Units
1
Standby mw
0
Status rule
some_units_idle
In service mw
861
Out of service mw
250
Fuel burned (MMBtu), 202546,766,849
Capacity factor, 20250.512
Heat rate (Btu/kWh), 202512,112.1
Net generation (MWh), 20253,861,166
Balancing authority codeERCO

Ownership

4 companies16
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CORP Owner 100.0% Dec 31, 2023 EPA GHGRP
Marathon Petroleum Company LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
Marathon Petroleum Company LP Owner 100.0% Dec 31, 2023 EPA GHGRP
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
South Houston Green Power LLC Operator EIA-860M

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · EIA · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Zeya Under construction Storage 1.2 mi 255.3
Red Egret Under construction Storage 5.3 mi 310.6
Vertus Energy Storage Plant Studied Storage 6.5 mi 204.9
Hidden Lakes Postponed Storage 9.9 mi 9.9
Berkman Storage Postponed Storage 12.3 mi 100

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution