Show on map
Greenland Gap - Mount Storm 500 kV — Transmission lineDavis Solar (WV) — Filed · Solar · WV · 11.5 MW · 9.8 mi away4786A George Washington, LLC — Under construction · Solar · MD · 2 MW · 10.0 mi away4786B George Washington, LLC — Under construction · Solar · MD · 2 MW · 11.4 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Greenland Gap - Mount Storm 500 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
500 kV
States crossed
US-WV
Owner (as stated)
Potomac Edison

Details

Who’s behind it

Owner
Potomac Edison

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
3
Substations at the ends (as the source names them)
Greenland Gap to Mount Storm
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpotomac edison
HIFLD line ID120637
Voltage class500 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Davis Solar (WV) Filed Solar 9.8 mi 11.5
4786A George Washington, LLC Under construction Solar 10.0 mi 2
4786B George Washington, LLC Under construction Solar 11.4 mi 2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution