Show on map
Greens Bayou 138 kV line — Transmission lineGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 0.2 mi awayTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 1.3 mi awayCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 6.1 mi awayTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 6.5 mi awayBESS TX Camarine - BSHOU001 — Under construction · Storage · TX · 9.9 MW · 9.7 mi awayTX LaPort 10060 Porter Road Solar — Postponed · Solar · TX · 1.6 MW · 11.7 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 13.7 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 13.7 mi awayNET Power La Porte Station — Studied · Gas, combustion turbine · TX · 25.5 MW · 15.0 mi away
  • Combustion
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Greens Bayou 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Centerpoint Energy Houston Electric

Details

Who’s behind it

Owner
Centerpoint Energy Houston Electric

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
6
Substations at the ends (as the source names them)
Greens Bayou
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcenterpoint energy houston electric
HIFLD line ID304328
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Greens Bayou 6 Under construction Gas, combustion turbine 0.2 mi 445
TX Houston 7080 Express Lane Postponed Storage 1.3 mi 1.5
CPV Pondera King Energy Center Postponed Gas, combined cycle 6.1 mi 900
Texas Petrochemicals Postponed Gas, combined cycle 6.5 mi 560
BESS TX Camarine - BSHOU001 Under construction Storage 9.7 mi 9.9
TX LaPort 10060 Porter Road Solar Postponed Solar 11.7 mi 1.6
Pamela Heights I Energy Center Under construction Storage 13.7 mi 101.7
Callisto II Energy Center Under construction Storage 13.7 mi 303.2
NET Power La Porte Station Studied Gas, combustion turbine 15.0 mi 25.5

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution